26th January 2018

Gallery

 

(Before)Faulty Watermill pump                                                                  (After) New Stewart & Turner pump fitted by Tomasz

                                                       

 

(Before)

Flue put together with tape instead of properly screwed and fixed

 

(After)

Put together properly Mindy one of our engineers

                    

 

Waste pipe and Franke sink trap put in by one of our Engineers

(Before)

                            

 

Waste pipe and sink trap fitted (After)

                           

 

New Kitchen sink fitted by Liam

(Before)

 

New fitted Kitchen sink (After)

                               

 

Director John Tabor, Giving a speech about the safety’s of Gas inspections at the BNI.

 

Keston Boiler Installation by Liam (Before)

 

Keston Boiler Installation by Liam (After)

 

Keston Boiler Installation

     

 

 

New Keston boiler Replacement

 

 

 

Brand New Pipes Fitted

                  

 

Out team enjoying BNI quiz night at the Beech House, St Albans.

 

Water tank Install/Pipework (Before)

           

 

Water tank/Pipework Install (After)

                                                                          

 

Water Filter newly fitted by one of our guys